Statement of compliance for vehicular access and/or drainage access request form
The Burnie Interim Planning Scheme 2013 requires that a planning permit application must establish the suitability of a site for development by demonstrating that vehicular access is available between the carriageway of a road and the development site in accordance with the Local Government (Highways) Act 1982. Similarly, the applicant must be able to demonstrate that stormwater from the development site can drain to a stormwater system in accordance with the Urban Drainage Act 2013.
The Statement of Compliance is an advice from the relevant Road Authority and/or Drainage Authority that access to the respective road network and stormwater system exists, is achievable and/or may be conditional.
This Statement of Compliance must be included with a planning permit application.
Instructions
Nature of proposed development
The application must provide a description. Relevant information could include number and type of dwellings proposed, nature of commercial activities including such factors as frequency, duration, hours of operation, number of possible occupants and customers, extent of subdivision or the type, frequency and number of vehicles likely to use the site.
Required information
Adequate statements, diagrams or plans must be included within the application to clearly illustrate the location of the desired vehicular access and/or drainage access to the site of the proposed development. Diagrams or plans must be to scale, based on aerial photographs or otherwise providing an accurate position for proposed vehicular access and/or drainage connection point to be established.
If the application is for a relocation or modification of an existing access, the location of both the existing and proposed accesses must be clearly shown.
A Statement of Compliance is valid for 12 months.
You will be notified by email as to whether or not your application is compliant.